LSTK FOR SADAF-IBNZAHR ISOBUTANE SYNERGY PROJECT

LSTK FOR SADAF-IBNZAHR ISOBUTANE SYNERGY PROJECT.

Scope: Fabricate and Install 6 Inch New Piping in SADAF, Ibn Zahr. Concrete Sleeper & Structural Work for 6 inch Pipeline. Supply of Metering Skid. Installation of Metering Skid & Analyzer House. Supply of ITT Pumps. Installation of ITT Pumps. Electrical & Instrumentation Field Works. DCE Systems and Configuration. Detailed Engineering. Hot Tapping. Thrust Boring for 6” Dia Pipe. Pigging Works etc.