    CO-GENERATION INTERCONNECTION FACILITIES AT JUAYMAH NGLF

    CO-GENERATION INTERCONNECTION FACILITIES AT JUAYMAH NGLF Boiler Feed Water Piping work, Valves installation and Hydrotest, High Pressure Steam Piping works, Instrumentation and Automation work, ISLS System modification and other electrical works, Cogen Interconnections, Vessel Modification works for R84-D-785 and R81-D-106, Fuel Gas loop line piping work etc. Read more
  • tag1

    REPLACEMENT OF PP LINED FRP PIPING (CATHOLYTE HEADER)

    REPLACEMENT OF PP LINED FRP PIPING (CATHOLYTE HEADER) Removal of Catholyte Header, Erection of Catholyte Header, Scaffolding Erection/Removal, Supply of Catholyte Header. Dismantling, erection of pipe, bolt-ups, installation of valves, welding/cutting RTR Pipes, Supply & Fabricate pipe supports, painting, Hydrotesting, Electrical/Instrumentation works etc. Read more
  • tag1

    CONSTRUCTION, ERECTION AND OTHER SITE RELATED WORKS / SERVICES

    CONSTRUCTION, ERECTION AND OTHER SITE RELATED WORKS / SERVICES CONSTRUCTION, ERECTION AND OTHER SITE RELATED WORKS / SERVICES for UGAA Projects for SAFCO-2, SAFCO-3, SAFCO-4 & IBB, Common Facilities for UGAA Projects and IBB Ammonia Flare System Project of Saudi Basic Industries Corporation (SABIC) at Al-Jubail, KSA. Scope: Civil & Structural works, Erection of Mechanical Equipments, Construction of Buildings, Piping and Ducting Works, Electrical Installation works, Instrumentation Installation works, Insulation works, Scaffolding erection, etc. Read more
  • tag1

    ABOVE GROUND SERVICES

    ABOVE GROUND SERVICES Contract consisting of Interconnecting Piping and Related Services, Sales Gas Metering Skid, Substation 02 Feeder Cables and Security System & Plant Lighting. Read more
  • tag1

    UPGRADE FIREWATER PIPING AT NINE SOUTHERN AREA OIL OPERATIONS GOSPS

    UPGRADE FIREWATER PIPING AT NINE SOUTHERN AREA OIL OPERATIONS GOSPS Project Summary: The purpose of the project is to upgrade the fire water piping system by installing new underground RTR Piping network and new fire fighting equipments... Read more
  • tag1

    MECHANICAL, ELECTRICAL & INSTRUMENTATION WORKS - QURAYYAH ASU PROJECT

    MECHANICAL, ELECTRICAL & INSTRUMENTATION WORKS - QURAYYAH ASU PROJECT Supply (excluding free issue material), fabrication and installation of piping, installation of equipment (including modules & skids) supply, fabrication and installation of steel structure, piping painting (including supply), piping and equipment insulation, electrical and instrumentation installations etc., for the construction of a new ASU Plant 1 & 2 with common storage facilities located in Qurayyah Sea Water Injection Plant (QSWIP) in Qurayyah – Saudi Arabia. Read more
  • tag1

    CONSTRUCTION OF 12” SATORP GAN PIPELINE

    CONSTRUCTION OF 12” SATORP GAN PIPELINE Procurement, Construction, Installation, Testing & Commissioning of Gaseous Nitrogen 12” Pipeline from the existing tie-in at 24” Nitrogen Header including metering station for Saudi Aramco Total Refinery & Petrochemical Co. (SATORP) in Jubail-II on LSTK Basis. Read more
  • tag1

    CONSTRUCTION AND COMMISSIONING OF THE NEW N2 COMPRESSOR PROJECT

    CONSTRUCTION AND COMMISSIONING OF THE NEW N2 COMPRESSOR PROJECT Earth work Excavation for 1.5 m. deep. Lean concrete, Concrete 30 Mpa & 35 Mpa., Formwork, Steel reinforcement, Structural Steel, Gratings, Coatings, Epoxy Grout, Roof Sheets, Piping, Electrical, Equipment Erection, Calibration of PSV’s, Alignment of Equipments, Installation of Analyzer and DCS etc. Read more
  • tag1

    GENERAL CONSTRUCTION SERVICES

    GENERAL CONSTRUCTION SERVICES Provide all labor, supervision, material where applicable, equipment, inspection, transportation, supplies, tools, construction equipment, temporary facilities and each and every item of expense necessary to provide construction services on work unit rate basis. The construction services shall cover all disciplines including Mechanical, Civil, Electrical, Instrumentation and other jobs required to support project works, maintenance activities and Turnaround works. (Welding, Pipe Erection, Scaffolding, Insulation, Coating, Excavation, Reinforced Concrete etc.) Read more
  • tag1

    LSTK FOR SADAF-IBNZAHR ISOBUTANE SYNERGY PROJECT

    LSTK FOR SADAF-IBNZAHR ISOBUTANE SYNERGY PROJECT Fabricate and Install 6 Inch New Piping in SADAF, Ibn Zahr. Concrete Sleeper & Structural Work for 6 inch Pipeline. Supply of Metering Skid. Installation of Metering Skid & Analyzer House. Supply of ITT Pumps. Installation of ITT Pumps. Electrical & Instrumentation Field Works. DCE Systems and Configuration. Detailed Engineering. Hot Tapping. Thrust Boring for 6” Dia Pipe. Pigging Works etc. Read more